All minutes with transparencies are available in EDMS under the project XFEL in the meeting folder (EDMS #16641). Most of the links below point directly into EDMS. To access these documents, make sure that your browser has JAVA implemented properly.
-
19th December 2007: 172. Meeting - - Minutes
- - H. Weise: Summary of the cold LINAC meeting, 12./13. Nov. 2007
- - H. Weise: Summary of the cold LINAC meeting, 12./13. Nov. 2007
-
12th December 2007: 171. Meeting - - Minutes
- - L. Fröhlich: Machine protection system for the XFEL
- - L. Fröhlich: Machine protection system for the XFEL
-
28th November 2007: 170. Meeting - - Minutes
- - W. Decking: Summary 3-way meeting, Oct 21/22, 2007, accelerator
- - T. Tschentscher: Summary 3-way meeting, Oct 21/22, 2007, photon beam systems
- - W. Decking: Summary 3-way meeting, Oct 21/22, 2007, accelerator
-
21st November 2007: 169. Meeting - - Minutes
- - C. Schulz: Status of Air Conditioning Systems for the XFEL Undulator Tunnels
- - C. Schulz: Status of Air Conditioning Systems for the XFEL Undulator Tunnels
-
14th November 2007: joint XFEL/ILC meeting - Agenda
-
7th November 2007: 168. Meeting - - Minutes
- - R. Wichmann: Status update MSPE stability problems
- - D. Reschke: Dry-ice cleaning
- - R. Wichmann: Status update MSPE stability problems
-
31st October 2007: 167. Meeting - - Minutes
- - T. Tschentscher: Start-up scenario of the photon beam systems
- - T. Tschentscher: Start-up scenario of the photon beam systems
-
24th October 2007: 166. Meeting - - Minutes
- - M. Yurkov: Report from FEL2007
- - M. Yurkov: Report from FEL2007
-
10th October 2007: 165. Meeting - - Minutes
- - H. Weise: Possible Russian in-kind contributions to the XFEL LINAC
- - F. Stephan: Latest results from PITZ
- - H. Weise: Possible Russian in-kind contributions to the XFEL LINAC
-
19th September 2007: 164. Meeting - - Minutes
- - M. Ross: Actual ILC-GDE plans and comments about the importance of Desy's and XFEL's role
- - M. Ross: Actual ILC-GDE plans and comments about the importance of Desy's and XFEL's role
-
12th September 2007: 163. Meeting - - Minutes
- - H. Sinn: HF + Status WP 22/23 Photon beam lines
- - H. Sinn: HF + Status WP 22/23 Photon beam lines
-
5th September 2007: 162. Meeting - - Minutes
- - D. Reschke: HF + H2SO4 free Poligrat/Accel EP: first result
- - J. Eckold: Pulse cable for the XFEL
- - D. Reschke: HF + H2SO4 free Poligrat/Accel EP: first result
-
29th August 2007: 161. Meeting - - Minutes
- - T. Tschentscher: Requirements to survey&aligment for photon beam lines and scientific instruments (AI 152.5.3)
- - M. Clausen: 'CSS- more than a sine-wave' Short demonstration of the Control System Studio functionality
- - W. Decking: Cooperation with the Munich Centre for Advanced Photonics (MAP) on Laser Plasma Accelerated Electron Beams
- - T. Tschentscher: Requirements to survey&aligment for photon beam lines and scientific instruments (AI 152.5.3)
-
22nd August 2007: 160. Meeting - - Minutes
- - H.-J. Christ: Preparation planning for the civil construction
- - H.-J. Christ: Preparation planning for the civil construction
-
18th July 2007: 159. Meeting - - Minutes
- - Yuhui Li: Tolerances for the XFEL undulator system
- - J. Pflüger: Interpretation of above results
- - Yuhui Li: Tolerances for the XFEL undulator system
-
11th July 2007: 158. Meeting - - Minutes
- - M. Clausen, A. Will (Uni HH, C1-WPS): Control System Studio (CSS) and Collaborative Design and Implementation of a new Operator Cockpit
- - M. Clausen, A. Will (Uni HH, C1-WPS): Control System Studio (CSS) and Collaborative Design and Implementation of a new Operator Cockpit
-
4th July 2007: 157. Meeting - - Minutes
- - D. Nölle: Summary Desy/PSI Workshop on BPMs
- - H. Weise: Summary LINAC meeting
- - D. Nölle: Summary Desy/PSI Workshop on BPMs
-
27th June 2007: 156. Meeting - - Minutes
- - R. Brinkmann, M. Altarelli: Initial XFEL project management structure
- - J. Pflüger: Status undulator prototyping
- - R. Brinkmann, M. Altarelli: Initial XFEL project management structure
-
20th June 2007: 155. Meeting - - Minutes
- - T. Hott: Summary TCM
- - T. Hott: Review procedures XFEL
- - H. Wabnitz: Damage to optics
- - T. Hott: Summary TCM
-
13th June 2007: 154. Meeting - - Minutes
- - H. Graafsma: Update detector program
- - H. Graafsma: Update detector program
-
6th June 2007: 153. Meeting - - Minutes
- - R. Brinkmann: 1. step XFEL facility: accelerator complex & infrastructure
- - T. Tschentscher: 1. step XFEL facility: photon beam systems
- - R. Brinkmann: 1. step XFEL facility: accelerator complex & infrastructure
-
30th May 2007: 152. Meeting - - Minutes
- - T. Limberg: Update beam dynamics group
- - T. Limberg: Update beam dynamics group
-
23rd May 2007: 151. Meeting - - Minutes
- - B. Racky: Interlock conditions for tunnel access during beam operation (AI 133.1.1)
- - B. Racky: Interlock conditions for tunnel access during beam operation (AI 133.1.1)
-
16th May 2007: 150. Meeting - - Minutes
- - T. Hott: Building review for call for tender preparation
- - R. Wichmann: new XFEL PSP code
- - R. Wichmann: Project Management System for the XFEL
- - T. Hott: Building review for call for tender preparation
-
9th May 2007: 149. Meeting - - Minutes
- - B. Petersen: Upgrading the HERA refrigerator for the XFEL
- - B. Petersen: Upgrading the HERA refrigerator for the XFEL
-
25th April 2007: 148. Meeting - - Minutes
- - N. Baboi: Summary of HOM workshop, Jan 2007
- - link to workshop web page
- - N. Baboi: Summary of HOM workshop, Jan 2007
-
11th April 2007: 147. Meeting - - Minutes
- - F. Hilgenstock: Changes to XSE
- - P. Folkerts: PR activities for the XFEL
- - F. Hilgenstock: Changes to XSE
-
4th April 2007: 146. Meeting - - Minutes
- - L. Lilje: Summary Module 6 Tests on the CMTB
- - L. Lilje: Summary Module 6 Tests on the CMTB
-
28th March 2007: 145. Meeting - - Minutes
- - S. Prat (LAL): Status industrial study of power couplers
- - T. Hott: Summary March TCM
- - S. Prat (LAL): Status industrial study of power couplers
-
21st March 2007: 144. Meeting - - Minutes
- - D. Nölle: Update cold BPMs
- - D. Nölle: Update cold BPMs
-
14th March 2007: 143. Meeting - - Minutes
- - A. Labanc: Investigation of electrical axes in TESLA-type cavities
- - A. Labanc: Investigation of electrical axes in TESLA-type cavities
-
28th February 2007: 142. Meeting - - Minutes
- - F. Poppe: Introduction to the XFEL movie "Light of the Future"
- - the movie can be downloaded from www.xfel.net
- - F. Poppe: Introduction to the XFEL movie "Light of the Future"
-
21st February 2007: 141. Meeting - - Minutes
- - R. Wichmann: Status summary 2007 and outlook 2007 (only available from the finance status pages)
- - T. Hott: TCM summary: Mechanical design effort and resources
- - R. Wichmann: Status summary 2007 and outlook 2007 (only available from the finance status pages)
-
14th February 2007: 140. Meeting - - Minutes
- - H. Weise: Summary of the S2 task force meeting (accelerator module string test for the ILC)
- - H. Weise: Summary of the S2 task force meeting (accelerator module string test for the ILC)
-
7th February 2007: 139. Meeting - - Minutes
- - Z. Wolf (SLAC): Magnetic measurements of the LCLS undulators
- - Z. Wolf (SLAC): Magnetic measurements of the LCLS undulators
-
31st January 2007: 138. Meeting - - Minutes
- - S. Simrock: Update SIMCON DSP
- - A. Matheisen: Update SC cavities (preparation, HW)
- - S. Simrock: Update SIMCON DSP
-
17th January 2007: 137. Meeting - - Minutes
- - W. Singer: Update SC cavities (material, fabrication, R&D)
- - W. Singer: Update SC cavities (material, fabrication, R&D)
-
10th January 2007: 136. Meeting - - Minutes
- - R. Wichmann: New SAP WA report (by H.-O. Alwert, VDV)
- - D. Proch: Report from China visit, Dec. 2006
- - T. Limberg: Summary beam dynamics review - BC system
- - R. Wichmann: New SAP WA report (by H.-O. Alwert, VDV)