This page contains the minutes of all meetings of the XFEL project group held in 2004.
-
15th December 2004: 58. Meeting - - Minutes
- - N. Golubeva: Preliminary layout of the beam collimation system
- - N. Golubeva: Preliminary layout of the beam collimation system
-
8th December 2004: 57. Meeting - - Minutes
- - L. Hänisch: Status of XS2 to XS4 in the PFV
- - L. Hänisch: Status of XS2 to XS4 in the PFV
-
1st December 2004: 56. Meeting - - Minutes
- - R. Brinkmann: Report from visit to Sweden
- - M. Dohlus: Wakefields and surface layer
- - R. Brinkmann: Report from visit to Sweden
-
24th November 2004: 55. Meeting - - Minutes
- - R. Wichmann: WPL status report template description (link to the template in EDM)
- - D. Nölle - Update cold BPMs
- - V. Katalev - new developments for the Q- and phase tuner
- - R. Wichmann: WPL status report template description (link to the template in EDM)
-
17th November 2004: 54. Meeting - - Minutes
- - G. Grübel: News from STI
- - L. Lilje - Summary of ILC Workshop at KEK
- - G. Grübel: News from STI
-
3rd November 2004: 53. Meeting - - Minutes
- - S. Schrader: XFEL safety concept PFV
- - S. Schrader: XFEL safety concept PFV
-
27th October 2004: 52. Meeting - - Minutes
- - L. Lilje: XFEL accelerator module meeting summary
- - W. Singer: Status WP-4 - SC cavities
- - L. Lilje: XFEL accelerator module meeting summary
-
20th October 2004: 51. Meeting - - Minutes
- - H. Schlarb: Components and space requirements in shaft XSE for the booster and BC
(the component list can be found here)- - R. Wenndorff: Pulse Repetition Frequency Enhancement Tests on RF-System with 5MW Klystron
- - H. Schlarb: Components and space requirements in shaft XSE for the booster and BC
-
13th October 2004: 50. Meeting - - Minutes
- - W. Decking: Beam dump line
- - N. Tesch: Beam dump shaft building
- - W. Decking: Beam dump line
-
6th October 2004: 49. Meeting - - Minutes
- - R. Wichmann: Financial status XFEL (slides available from the finance status page)
- - L. Hänisch: Status XS1 and XH1 in PFV
- - R. Wichmann: Financial status XFEL (slides available from the finance status page)
-
29th September 2004: 48. Meeting - - Minutes
- - G. Geloni: FEL2004 report - FEL developments
- - K. Tiedke: FEL2004 report - user workshop
- - G. Geloni: FEL2004 report - FEL developments
-
22nd September 2004: 47. Meeting - - Minutes
- - T. Tschentscher: Status of the experimental hall & the Schenefeld site
- - T. Tschentscher: Status of the experimental hall & the Schenefeld site
-
15st September 2004: 46. Meeting - - Minutes
- - L. Hänisch - Status of XSE in PFV
- - L. Hänisch - Building ground investigation (only within .desy.de)
- - L. Hänisch - Status of XSE in PFV
-
1st September 2004: 45. Meeting - - Minutes
- - L. Hagge, R. Wichmann - Documentation in the XFEL project
- - L. Hagge, R. Wichmann - Documentation in the XFEL project
-
25th August 2004: 44. Meeting - - Minutes
- - M. Yurkov - A novel electron bunch diagnostic scheme
- - O. Grimm - Bunch length measurement with coherent far-infrared radiation
- - M. Yurkov - A novel electron bunch diagnostic scheme
-
4th August 2004: 42. Meeting - - Minutes
- - H. Lierl - Status of the Planning for the XFEL Cryo- and Modulator Halls
- - H. Lierl - Status of the Planning for the XFEL Cryo- and Modulator Halls
-
14th July 2004: 41. Meeting - - Minutes
- - W. Singer - Damage on Cu coated bellows
- - H.-J. Eckoldt - Pulse Cable for XFEL
- - W. Singer - Damage on Cu coated bellows
-
30th June 2004: 40. Meeting - - Minutes
- - H. Weise - PFV XTL from XSE to XS1
- - H. Weise - PFV XTL from XSE to XS1
-
16th June 2004: 39. Meeting - - Minutes
- - J. Sekutowicz - WP 6: HOM coupler and beam line absorber
- - J. Sekutowicz - WP 6: HOM coupler and beam line absorber
-
9th June 2004: 38. Meeting - - Minutes
- - K. Rehlich - WP 28: Control Systems
- - K. Rehlich - WP 28: Control Systems
-
26th May 2004: 37. Meeting - - Agenda and Minutes
- - R. Brinkmann - Preliminary financial planning for 2004-06 (available only through S:\user\group\mpy\groupadm\XFEL\XFEL-Planning\XFEL-Project\Finances )
- - R. Brinkmann - Preliminary financial planning for 2004-06 (available only through S:\user\group\mpy\groupadm\XFEL\XFEL-Planning\XFEL-Project\Finances )
-
19th May 2004: 36. Meeting - - Agenda and Minutes
- - W. Decking - Status Layout Electron Beam Distribution
- - A. Schwarz - Proposed Base Layout for the XFEL (slides available from author)
- - W. Decking - Status Layout Electron Beam Distribution
-
12th May 2004: 35. Meeting - - Agenda and Minutes
- - M. Seidel: WP 19 Vacuum System
- - M. Seidel: WP 19 Vacuum System
-
5th May 2004: 34. Meeting - - Agenda and Minutes
- - J.-P. Jensen Report from the "Water Workshop"
- - H. Ehrlichmann "Measurements of Ground Vibration"
- - J.-P. Jensen Report from the "Water Workshop"
-
28th April 2004: 33. Meeting - - Agenda and Minutes
- - R. Wichmann: XFEL project structure and cost centers (Kostenstellen)
- - WP32 - J. Prenting: Survey and Alignment
- - R. Wichmann: XFEL project structure and cost centers (Kostenstellen)
-
21st April 2004: 32. Meeting - - Agenda and Minutes
- - S. Simrock: Introduction to radiation and electronics
- - D. Rybka: Results of the radiation and electronics study
- - S. Simrock: Introduction to radiation and electronics
-
14th April 2004: 31. Meeting - - Agenda and Minutes
- - Presentation K.Lütjens: Economic supply effects of the building of the XFEL
- - Presentation K.Lütjens: Economic supply effects of the building of the XFEL
-
31st March 2004: 30. Meeting - - Agenda and Minutes
- - Presentation H. Brück: Vibration measurements at TTF accelerator modules and short update on cold quadrupoles for XFEL
- - Presentation H. Brück: Vibration measurements at TTF accelerator modules and short update on cold quadrupoles for XFEL
-
24th March 2004: 29. Meeting - - Agenda and Minutes
- - Presentation U. Nielsen: Planning WPs with MS Project (MS Project template)
- - Presentation D. Trines: XFEL Finances
- - additional information: Description paper for MS-Project template
- - Presentation U. Nielsen: Planning WPs with MS Project (MS Project template)
-
17th March 2004: 28. Meeting - - Agenda and Minutes
- - Presentation M. Yurkov: Choice of undulator parameters - 1 Angstrom at 17.5 GeV
- - Presentation R. Brinkmann: Update on accelerator parameter space
- - Presentation M. Yurkov: Choice of undulator parameters - 1 Angstrom at 17.5 GeV
-
10th March 2004: 27. Meeting - - Agenda and Minutes
- - J. Feldhaus: European FEL Design Study
- - Presentation WP8 K. Zapfe: Cavity Flanges and Cold Vacuum
- - J. Feldhaus: European FEL Design Study
-
25th February 2004: 25. Meeting - - Agenda and Minutes
- - M. Yurkov: Attosecond option for the XFEL
- - M. Yurkov: Attosecond option for the XFEL
-
18th February 2004: 24. Meeting - - Agenda and Minutes
- - T. Tschentscher: Status and current experience from the SPPS
- - T. Tschentscher: Status and current experience from the SPPS
-
11th February 2004: 23. Meeting - - Agenda and Minutes
- - D. Noelle: Report from visit to SLS
- - A. Schwarz: Information from PFV about baseline decisions
- - M. Minty: Presentation WP29 - Operability and failure handling
- - D. Noelle: Report from visit to SLS
-
28th January 2004: 21. Meeting - - Agenda and Minutes
- Presentation J. Pflueger: WP21 Undulators
-
14th January 2004: 20. Meeting - - Agenda and Minutes
- Presentation J.-P. Jensen: WP34 Utilities
- Presentation D. Noelle: update on the cold BPM teststand